HIGHLIGHTS:
> Successful completion and delivery of the first set of deliverables for the ongoing FEED for large-
scale LCO2 Tanks, delivered on time and budget in January 2026.
> The FEED program includes detailed engineering and material and weld testing of a proprietary
25,000 cbm LCO2 low-pressure tank, integration with Yinson’s FSIU and ongoing Class approval
process with DNV.
> The FEED program is funded under the Joint Development Agreement (JDA) with a target
completion for June 2026.
> Yinson Production continues with the development of its FSIU with a timeline for FID late-2026.
Provaris Energy Ltd (ASX: PV1) (“Provaris” or the “Company”) is pleased to announce that, in
collaboration with its LCO₂ tank development partner Yinson Production, has successfully completed
the Phase 1 delivery of the LCO2 Tank Front End Engineering and Design (FEED) program on time and
within budget during January 2026.
Yinson Production has advised Provaris to continue with Phase 2 to finalise the FEED stage under the
JDA terms, with the program to run through to June 2026, and milestones to include Class Approval
and a fully costed fabrication facility and tank production cost estimate.
The FEED will focus on finalising detailed engineering and FEM modelling, testing, and design for
fabrication of the 25,000 cbm LCO2 low pressure tank. The LCO2 tank is developed for integration into
Yinson Production’s design for a Floating Storage Injection Unit (FSIU) with 100,000 cbm storage
capacity, intended for deployment at the Havstjerne CCS project located in the North Sea. The new
LCO2 tank design will also be suitable for LCO2 carriers and LCO2 storage/ terminal applications.
The design and development of new large-scale tanks are seen as critical to the
commercialisation of CO2 supply chains. The primary target of Provaris’ large-scale LCO2 tank
design at 3-4x the capacity of existing Type C tanks is to reduce the number of tanks required for
FSIU and large scale LCO2 carriers. The benefits will result in lower capital cost for vessels (smaller
hill dimensions, improved hull utilisation, and fewer process systems) and lower operating cost
(simplified operations and maintenance), with the goal to deliver lower cost per tonne of LCO₂
transported.
Provaris’ Chief Technical Officer, Per Roed, commented: "We are proud to have achieved this
milestone in the development and delivery of our pioneering 25,000 cbm LCO₂ tank FEED program,
on schedule and within budget. This accomplishment reflects the dedication, innovation and technical
expertise of our team and partnership with Yinson and marks a major step forward in advancing large-
scale CO₂ storage solutions for the market. These advancements position us to deliver real value to
Yinson and other prospective partners and customers seeking efficient, cost-effective solutions for
CO2 supply chains at scale."
ASX ANNOUNCEMENT & MEDIA RELEASE | 06 February 2026
www.provaris.energy Page | 2
FEED Phase 2 Scope & Timeline
Phase 2 FEED is scheduled to complete in June 2026 with a focus on building upon the proprietary
detailed design and fabrication of a multi-layered sandwich tank that complies with the IGC codes1
.
The continued FEED scope covers:
> Detailed structural and FEM modelling of tank it’s accessories.
> Validation of structural performance of the Tank through rigorous testing.
> Fabrication of test elements, and validation of production processes, at Provaris’ automated
fabrication facility in Norway.
> Digitisation and automated fabrication processes using robots and laser and laser-hybrid
welding processes.
> Tank integration with Yinson Production’s FSIU.
> Ongoing Class Approval process with DNV for a General Approval for Ship Application (GASA)
certificate.
Illustration of Yinson Production’s FSIU Design Concept (Source: Yinson Production)
- END -
This announcement has been authorised for release by the CEO of Provaris Energy Ltd.
To review this Announcement or submit Q&A please visit the Provaris InvestorHub here
For further informationplease contact:
Norm Marshall Martin Carolan
Company Secretary Managing Director & CEO
+61 481 148629 +61 404 809019
nmarshall@provaris.energy mcarolan@provaris.energy
Sydney | Oslo
1
International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk
ASX.PV1 @ProvarisEnergy Provaris Energy Ltd. info@provaris.energy
ASX ANNOUNCEMENT & MEDIA RELEASE | 06 February 2026
www.provaris.energy Page | 3
Provaris
We encourage shareholders and potential investors to utilise our InvestorHub for any enquiries regarding
this announcement or other areas related to Provaris. This platform offers an opportunity to submit
questions, share comments, and view video summaries of all announcements, media and relevant industry
publications.
To access Provaris InvestorHub please scan the QR code or visit https://investors.provaris.energy/
About Provaris Energy
Provaris Energy Ltd (ASX: PV1) is advancing innovative Compressed Hydrogen (H2) and Carbon Dioxide (CO₂) storage and
transport solutions through proprietary tank designs for storage maritime gas carriers, and integrated supply chain
development. Focused on simplicity, efficiency and scalability, Provaris enables regional supply chains that support the global
energy transition. www.provaris.energy
Disclaimer: This announcement may contain forward looking statements concerning projected costs, approval timelines, construction
timelines, earnings, revenue, growth, outlook or other matters (“Projections”). You should not place undue reliance on any Projections,
which are based only on current expectations and the information available to Provaris. The expectations reflected in such Projections are
currently considered by Provaris to be reasonable, but they may be affected by a range of variables that could cause actual results or trends
to differ materially, including but not limited to: price and currency fluctuations, the ability to obtain reliable hydrogen supply, the ability to
locate markets for hydrogen, fluctuations in energy and hydrogen prices, project site latent conditions, approvals and cost estimates,
development progress, operating results, legislative, fiscal and regulatory developments, and economic and financial markets conditions,
including availability of financing. Provaris undertakes no obligation to update any Projections for events or circumstances that occur
subsequent to the date of this announcement or to keep current any of the information provided, except to the extent required by law. You
should consult your own advisors as to legal, tax, financial and related matters and conduct your own investigations, enquiries and analysis
concerning any transaction or investment or other decision in relation to Provaris. $ refers to Australian Dollars unless otherwise indicated.
Share your feedback
Discover