Provaris Energy Ltd (ASX: PV1, Provaris, the Company) is pleased to provide the following summary of the
Company’s development activities for the quarter that ended 30 September 2023.
FJORDH2 PROJECT COLLABORATION WITH NORWEGIAN HYDROGEN
•
Continued work with Norwegian Hydrogen AS on the agreed joint development activities for the 270MW FjordH2
export project, in Norway.
•
Focus is on site permits, PFS optimisation, systematic QRA studies, and planning for detailed feasibility / FEED studies
in 2024.
•
Site trip also undertaken to the project site at Ørskog by Provaris management, Non-Executive director and major
shareholder.
ÅFJORD PROJECT COLLABORATION WITH GEN2 ENERGY
•
Prefeasibility Study commenced in August, with completion of a feasibility study targeted for February 2024.
•
Successful completion of economic modelling and project site layout required for Gate 1, highlights the attractive
economics that Provaris’ unique supply chain solution offers to Norwegian export sites.
•
Project evaluation Gates 2 and 3 will focus on project schedule and technical review of the complete supply chain.
In parallel, technical qualification and safety analysis of the H2Neo carrier and containment tank are underway.
TIWI H2 PROJECT (AUSTRALIA)
•
Continue to engage with the Tiwi Land Council to progress the proposed draft project and land agreements submitted
by Provaris earlier this year, which propose a significant community benefits package.
•
The key focus for the rest of 2023 remains on achieving satisfactory outcomes with the Tiwi Land Council and other
stakeholders to finalise contractual agreements and secure land access required for the Tiwi H2 project in 2024.
H2NEO CARRIER DEVELOPMENT & PROTOTYPE TANK
•
The prototype tank design progressed according to the schedule with detailed structural calculations and finite
element modelling undertaken.
•
The principal particulars of the prototype tank have been concluded, including the design of spherically shaped end
caps and a joint mid-tank, with final tank design and testing protocols submitted to Class at the end of October.
•
Multiple on-site meetings, including a site trip attended by Provaris Management, Non-Executive Director and a major
shareholder, confirm that the program remains on track for construction and testing in Q1 2024.
•
CFER Stage 3 test nearing completion with results supporting the weld procedures developed for the stainless steel
liner and selected carbon steel. The completion and final results are anticipated in November this year.
CORPORATE
•
Research published in collaboration with renowned German institutions reinforces the competitive costs of
compressed hydrogen supply into Europe.
•
Increasing focus from German utilities, end-users and the owners of ports and pipelines seeking solutions for green
hydrogen import by 2030.
•
Appointment of Frankfurt based DGWA for IR activity in Europe.
P rovaris M anaging Director and CEO, M artin Carolan, com m ented: “Our emphasis in Norway and Europe
persists in underscoring the advantages of bulk-scale compressed hydrogen - highly energy-efficient, technically
robust, and economically compelling. This heightened focus has resulted in a growing interest in Provaris from end
users, ports, and pipeline operators in Germany seeking solutions to fulfill their commitments.
Validating commercial preparedness via collaboration projects for the supply of green hydrogen developed using
Provaris solutions and demonstrating technical readiness through our Tank Prototype program will soon provide the
industry recognition and validation that our shareholders stand to gain from.”
www.provaris.energy
1
Quarterly Activities Report – September 2023
| Norwegian Hydrogen AS | Norway
Following on from the recent successful completion of the Prefeasibility Study in the June quarter, conducted in
collaboration with Norwegian Hydrogen AS (the Partners), the September quarter continued with the joint-development
of a 270MW electrolyser, compression, and marine jetty facility. The proposed hydrogen export volume will be ~40,000
tonnes per annum utilising Provaris’ H2Leo barge storage to optimise production and a fleet of two (2) H2Neo carriers
for the efficient and low-cost transport to key ports in Europe. The focus for the remainder of 2023 includes:
•
•
•
•
•
•
•
Securing power capacity reservation for the project;
Commencing environmental / development permits and approvals;
Optimisation of the PFS economic model and undertaking detailed engineering reports on the hydrogen
production facility, balance of plant, compression, and export facilities;
Completing quantitative risk assessment (QRA) and safety assessments;
Securing key partners and agreements to commence detailed feasibility / FEED studies in 2024;
Obtaining quotations from key equipment / system suppliers (compression and electrolysers); and
Undertaking discussions with potential offtake parties.
This ambitious project development timeline being pursued reflects the Partners commitment to making green
hydrogen a reality on a large scale, contributing to Europe’s REPowerEU policy ambitions.
For the transportation of the compressed hydrogen to Europe, the Fjord H2 project will utilise Provaris’ H2Leo storage
barge (26,000m3) and two (2) H2Neo carriers (26,000m3) enabling a competitive delivered cost of hydrogen within the
range of EUR 1.00-1.50/kg (excluding H2 production costs).
Provaris’ compressed hydrogen export supply chain stands out for its simplicity and energy efficiency, resulting in a
very competitive delivered cost to Europe. This flexible and low-cost solution aligns perfectly with the Partners’ ambition
for scaling up generation to multiple sites for transportation as gaseous green hydrogen to Europe. Additionally, the
operating flexibility of compression can allow the project to take advantage of variable power prices to reduce
production costs and provide operational turn-down capacity to assist with balancing the local grid demand.
Norw egian Hydrogen’s CEO Jens Berge comm ented: ”We continue to progress the FjordH2 Project within our
mixed portfolio of small and large projects for green hydrogen in the Nordics. The Ørskog site has many advantages for
hydrogen production and we see the addition of the Provaris solution as the most attractive and cost effective manner to
mature the project for first exports to Europe.”
During September a site trip to the Ålesund office of Norwegian Hydrogen and the location of the facility at Orskog was
made by Provaris’ Management, a Non-Executive Director and a major shareholder.
Illustration of hydrogen production facility at Ørskog in Ålesund municipality and compression facility
and terminal including H2Leo storage & H2Neo carrier with direct access to sea
To view a short animation of the FjordH2 project please click the image below.
www.provaris.energy
2
Quarterly Activities Report – September 2023
|Gen2 Energy AS | Norway
Gen2 Energy AS and Provaris Energy Ltd signed a Collaboration Agreement in June this year. Under the Agreement, the
parties agreed to undertake a comprehensive Prefeasibility Study to assess the technical and economic feasibility of
producing and supplying compressed green hydrogen from a hydrogen production project in Åfjord, Norway to key
European ports; leveraging Provaris’ advanced marine storage and shipping supply chain, including the Provaris’ H2Leo
storage barge (26,000m3) and H2Neo carriers (26,000m3).
Provaris is pleased to advise that during the quarter, the Prefeasibility Study (which commenced in
August) derived a detailed economic model with positive results and a decision by both parties to approve
the Gate 1 evaluation stage. The success of Gate 1 continues to highlight the attractive economics Provaris’ unique
supply chain solution offers to Norwegian export sites.
Provaris and Gen2 Energy will now proceed through to Gate 2 which includes:
•
•
•
Development of a Project Schedule;
Technical review (by Gen2 Energy) of the H2Neo cargo containment system and carrier (including site visit and
meetings with Prodtex to review the prototype tank program); and
Preliminary review of all safety risks/hazards for the project site.
Gen2 Energy and Provaris share a commitment to green hydrogen production and export projects using compression
as the delivery vector. Gen2 Energy’s focus on the export of compressed hydrogen using high pressure containers to
European markets provides a sound understanding of the benefits of compression, while Provaris specializes in providing
innovative integrated bulk-scale storage and marine transportation solutions for green hydrogen.
Åfjord project in Trøndelag region, Norway
| Australia
Provaris acknowledges that its proposed Tiwi H2 Project is located on the traditional lands of the Munupi people. It is a privilege to
have the support and such a close working relationship with the Munupi Clan and other key stakeholders.
Provaris continues to engage with the Tiwi Land Council to progress the proposed draft project and land agreements
submitted by Provaris earlier this year. The proposed draft agreements propose a significant community benefits
package, which Provaris looks forward to presenting shortly to the Munupi Clan, subject to Tiwi Land Council timing.
The key focus for the rest of 2023 remains on achieving satisfactory outcomes with the Tiwi Land Council, Tiwi
Plantation Corporation, Office of Township Leasing and Deloitte (Port Melville) to finalise contractual agreements and
secure land access required for the Tiwi H2 project.
Subject to positive progress on the above contractual and land access arrangements, Provaris is set to commence the
Front-End Engineering Design (FEED) and other engineering studies/activities on-site, including an overall geotechnical,
hydrological, and earthing/lightning program, as well as the initiation of solar monitoring.
As previously announced, the Northern Territory Environment Protection Authority (NTEPA) finalised the EIS ”Terms of
Reference” on 26 April 2023; a copy of which is published on the NTEPA website at https://ntepa.nt.gov.au/yourbusiness/public-registers/environmental-impact-assessments-register.
Preparation and submission of the EIS is now planned for 2024, covering both the Northern Territory and Federal
Government EPBC approval processes. However, the timing of such is subject to positive progress on the above
mentioned contractual and land access arrangements.
www.provaris.energy
3
Quarterly Activities Report – September 2023
Provaris continues to be in discussions with potential joint venture partners who share the vision of taking the project
through to FEED and a future final investment decision. This collaborative approach is expected to enhance the overall
success and impact of the project, positioning Provaris as a key player in hydrogen supply chains.
To view a short animation video of the Tiwi H2 project click the image below:
Prototype Tank Design and Testing
In July, as part of our investigations for the required tank prototype testing, Provaris awarded Norwegian based
Prodtex AS (Prodtex) a contract to design, construct and test a prototype scaled tank, alongside SINTEF, Norway’s
leading independent research organization. American Bureau of Shipping (ABS) and Det Norske Veritas (DNV) are
appointed for joint certification and final Class Approvals, set to be obtained in Q1 2024.
During the quarter the Prototype tank design progressed according to the agreed schedule, with detailed structural
calculations and finite element modelling undertaken. The principal particulars have been concluded, including design
of spherically shaped end caps and a joint mid-tank (to reflect the joints included in Provaris’ H2Neo carrier). Progress
was verified through multiple on-site meetings, including a site trip attended by Provaris Management, a Non-Executive
Director and a major shareholder.
Design work for the prototype has been performed in parallel with digital twin works in order to verify constructability
for both the prototype and the full scale tanks required for the H2Neo. The prototype design is based on a carbon steel
plate with 8 mm thickness and 700 MPA minimum yield strength, sourced from SSAB in Sweden, and certified by DNV.
Using existing robots and laser welding equipment, Prodtex verified the ability to join layered plates to achieve the
required wall thickness of the tank.
The scale and capacity of the prototype tank is approximately:
Outer diameter:
2.5 meters
Overall Length:
10 meters
Volume:
740kg hydrogen at 250 bar
Design of Prototype tank is on schedule to be submitted to Class at the end of October at Prodtex
production facility located in Fiskå, Norway (as planned). Next stage will include completion of the digital
twin of the Prototype (expected end November) to enable construction to commence in January 2024,
supporting our target of completion of all testing and award of Final Class Approvals at the end of Q1
2024.
Design concepts are now being considered for storage tanks from single to double digit tonnage capacity which expands
Provaris’ IP and commercial ambitions into onshore static storage solutions, providing entry to a substantial addressable
market and industry need, and providing the potential for a cash flow generating business in the 2025 financial year.
Provaris looks forward to updating shareholders shortly on this new development.
The automated tank fabrication, using the proven application of robotics and laser welding technology, offers cost
advantages over existing solutions, positioning Provaris as a front-runner in the delivery of low-cost hydrogen storage.
Increased productivity (~20x)
100% quality assurance (NDT)
Reduction in construction costs
www.provaris.energy
Reduced heat & energy costs
Reduction in CO2 footprint
Extends Provaris IP to new revenue products
4
Quarterly Activities Report – September 2023
Prodtex’s Production Facility located in Fiskå, Norway
CFER Technologies (Canada) – Carbon Steel Plate and Welding Procedures
Separate to the prototype tank program, Provaris is nearing completion of the qualification of selected cargo tank
materials and welding procedures in collaboration with C-FER Technologies (Edmonton, Canada). The testing program,
initiated in mid-2022 has made good progress in the quarter with the final Stage 3 phase nearing completion after
over-coming various issues with the test equipment for connecting the steel plates to the fatigue test facility. A new
carbon steel plate was procured due to issues with the material properties of the initial plates received. The purpose
of the test is to demonstrate that the weld could survive over 100,000 cycles during the full-thickness
tests, for both stainless steel (as a tank liner) and carbon steel material. The specimens are welded according
to the established design. The stainless samples (30mm thick) were tested in a pressurized hydrogen environment.
The carbon steel (70mm thick) was tested in air.
Results to date include:
Stainless Steel:
Average of 4 samples = 170,000 cycles
Carbon Steel:
First sample achieved 169,000 cycles; Sample 2 remains ongoing having achieved
>100,000 cycles and remains ongoing as at this report date.
The success of the program proves the welding procedures developed produce seam welds in both high-strength
carbon steel and stainless steel that can safely meet the design and operational requirements of the tank. These
results support future reviews and due diligence with banks, shipyards and future commercial partners, and place
Provaris in a strong technical position to work with Classification Societies to minimize the requirements for further
prototype testing.
Independent research reinforces the benefits of compressed hydrogen supply chain
Post the September quarter, Provaris released the summary of findings from independent research studies on the cost
of production and transport of hydrogen from renewable resources into Germany which has reinforced the compelling
technical and economic outcomes of the Company’s 2023 Hydrogen Marine Transport Comparison Report, published
in May 2023, and supports our focus on the development of regional hydrogen supply chains from Norway to Europe.
(A copy of the ASX release and highlights of the study are available here)
Comprehensive studies supported by German Federal Ministry for Economic Affairs and Climate Action and the Federal
Ministry for Economic Cooperation and Development, conducted in collaboration with renowned German institutions
such as Agora Industry, Hamburg University of Technology 1, and Fraunhofer ISE 2, spotlight the pivotal role of
production efficiency and transportation cost when sourcing green hydrogen from the most economically viable regions
for renewable energy.
1
Agora Industrie and TU Hamburg (2023), supported by the Federal Ministry for Economic Affairs and Climate Action
Fraunhofer Institute for Solar Energy Systems ISE on behalf of the H2Global Foundation in cooperation with Gesellschaft fur international Zusammenarbeit (GIZ),
supported by the Federal Ministry for Economic Cooperation and Development.
2
www.provaris.energy
5
Quarterly Activities Report – September 2023
Key findings include:
•
•
•
•
•
Liquid Hydrogen (LH2) transport costs approximately EUR 6/kg H2, affected by LH2 carrier investments and
liquefaction expenses.
Methanol transport costs slightly more at EUR 6.2/kg H2, increasing to around EUR 7/kg H2 for CO2 Direct Air
Capture projects.
Ammonia transport costs around EUR 7/kg H2, incurring higher losses in conversion and re-conversion stages.
Gaseous H2 by pipeline from Norway, Iberia, Nth Africa costs EUR 4.8 to 5.7/kg H2 for short pipeline distances.
Provaris to provide a highly competitive delivered cost range of EUR 4.90 to 5.90 /kg from
Norway.
Figure 1: Summary of LCOH Results by Fraunhofer and Agora publications (250ktpa production scale)
These in-depth studies also highlight promising market demand and the cost-competitiveness of exporting green,
compressed hydrogen from Norway to the EU. It is noteworthy that the EU's Renewable Energy Directive explicitly
necessitates that 42% of industrial hydrogen must be green by 2030, with a goal of reaching 60% by
2035. Additionally, the directive underscores that 1% of all fuels used in 2030 must be Renewable Fuels of NonBiological Origin.
Marketing to European Industry Stakeholders: Utilities, Industrial Users, Ports, Pipelines
Provaris has continued to spend considerable time in Germany post the European summer holidays. This has included
road shows to the UK for institutional investors focused on Hydrogen and Germany, where workshops have focused
on detailed technical and economic assessments of the delivered cost of hydrogen and the integration of the Provaris
H2Neo carriers within the downstream requirements for ports and pipeline infrastructure to develop the demand
markets.
Provaris continues to see an increase in the number of interested parties who now recognize that the simplicity and
efficiency of compression can be a first mover and, long-term, lower their cost of green hydrogen required to kickstart the decarbonization of industry applications such as steel, refining, smelters and chemical industries. Discussions
are taking place with end-users and the owners of ports and pipelines who both need to firm up business plans for
the import of green hydrogen where the commitment aligns with the EU state and Federal funding programs in support
of the region’s REPowerEU policy ambitions; which require the import of 10Mptpa of green hydrogen by 2030. EU
legislation has also approved the Renewable Energy Directive (RED III) that requires 42% of the hydrogen used
by industry must be green by 2030 (and reaching 60% in 2035).
Appointment of German Investor Relations Advisor
In August, the appointment of Frankfurt based DGWA, the German Institute for Asset and Equity Allocation and
Valuation (Deutsche Gesellschaft für Wertpapieranalyse GmbH) was made as the Company’s investor relations advisor
www.provaris.energy
6
Quarterly Activities Report – September 2023
in Europe. The Appointment seeks to develop and maximise the value of the pre-existing dual listing of the Company’s
shares on Frankfurt, Tradegate and other German exchanges (WKN: A3DMYM) and assist Provaris to engage with
retail, institutional and family office investors in the German speaking DACH region (Germany, Austria, and
Switzerland). This appointment also includes the release of a German speaking investor homepage for Provaris:
https://www.provaris.energy/de
Cash balance on 30 September 2023 was $2.8 million.
Cash expenditure during the quarter was elevated, with operating cash outflow of ~$2 million. Notably, the additional
investment in R&D and IP development includes the CFER material and weld testing (Canada) and the commencement
of the Prototype Tank program with Prodtex (Norway). Refer to the separately released ASX Appendix 4C for further
details.
The aggregate amount for payments to related parties and their associates included in item 6.1 in the Company’s ASX
Appendix 4C for the quarter ended 30 September 2023 was $226,000 comprising of fees, salaries and superannuation
paid to Directors, including Executive Directors.
- END –
This ASX announcement has been authorised by the Board of Provaris Energy Ltd.
To receive all company updates please
Norm Marshall
Company Secretary
+61 481 148629
nmarshall@provaris.energy
ASX.PV1
Martin Carolan
Managing Director & CEO
+61 404 809019
mcarolan@provaris.energy
@ProvarisEnergy
Melanie Singh
NWR Communications
+61 439 748 819
melanie@nwrcommunications.com.au
Provaris Energy Ltd.
info@provaris.energy
Perth | Sydney | Oslo
About Provaris Energy
Provaris Energy Ltd (ASX: PV1) | www.provaris.energy
Provaris Energy (ASX: PV1) is an Australian public company developing a portfolio of integrated green hydrogen projects for the
regional trade of Asia and Europe, leveraging our innovative compressed hydrogen bulk storage and carrier. Our focus on value
creation through innovative development that aligns with our business model of simple and efficiency hydrogen production and
transport can establish an early-mover advantage for regional maritime trade of hydrogen and unlock a world of potential. In August
2022 Provaris Norway AS was established to advance the development of hydrogen export projects from Norway and other European
locations.
Disclaimer: This announcement may contain forward looking statements concerning projected costs, approval timelines,
construction timelines, earnings, revenue, growth, outlook or other matters (“Projections”). You should not place undue reliance on
any Projections, which are based only on current expectations and the information available to Provaris. The expectations reflected
in such Projections are currently considered by Provaris to be reasonable, but they may be affected by a range of variables that could
cause actual results or trends to differ materially, including but not limited to: price and currency fluctuations, the ability to obtain
reliable hydrogen supply, the ability to locate markets for hydrogen, fluctuations in energy and hydrogen prices, project site latent
conditions, approvals and cost estimates, development progress, operating results, legislative, fiscal and regulatory developments,
and economic and financial markets conditions, including availability of financing. Provaris undertakes no obligation to update any
Projections for events or circumstances that occur subsequent to the date of this announcement or to keep current any of the
information provided, except to the extent required by law. You should consult your own advisors as to legal, tax, financial and
related matters and conduct your own investigations, enquiries and analysis concerning any transaction or investment or other
decision in relation to Provaris. $ refers to Australian Dollars unless otherwise indicated.
www.provaris.energy
7
Rule 4.7B
Appendix 4C
Quarterly cash flow report for entities
subject to Listing Rule 4.7B
Name of entity
Provaris Energy Ltd
ABN
Quarter ended (“current quarter”)
53 109 213 470
30 September 2023
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
(a)
research and development
-
-
(b)
product manufacturing and operating
costs
-
-
(c)
advertising and marketing
(91)
(91)
(d)
leased assets
-
-
(e)
staff costs
(679)
(679)
(f)
administration and corporate costs
(293)
(293)
-
-
35
35
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
155
1.81
Other (R&D Rebate Income)
-
-
1.82
Other (Project development)
(1,208)
(1,208)
1.9
Net cash from / (used in) operating activities
(2,236)
(2,236)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a)
entities
-
-
(b)
businesses
-
-
(c)
property, plant and equipment
-
-
(d)
investments
-
-
(e)
intellectual property
-
-
(f)
other non-current assets
-
-
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from disposal of:
(a)
entities
-
-
(b)
businesses
-
-
(c)
property, plant and equipment
-
-
(d)
investments
-
-
(e)
intellectual property
-
-
(f)
other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing activities
-
-
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing activities
-
-
4.
Net increase / (decrease) in cash and cash
equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
5,070
5,070
4.2
Net cash from / (used in) operating activities
(item 1.9 above)
(2,236)
(2,236)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
-
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
4.5
Effect of movement in exchange rates on cash
held
13
13
Cash and cash equivalents at end of period
2,847
2,847
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
Current quarter
$A’000
Previous quarter
$A’000
5.
Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,847
2,070
5.2
Call deposits
1,000
3,000
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
2,847
5,070
6.
Payments to related parties of the entity and their associates
6.1
Aggregate amount of payments to related parties and their associates
included in item 1
226
6.2
Aggregate amount of payments to related parties and their associates
included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of,
and an explanation for, such payments
Item 6.1 includes fees, salaries and superannuation paid to directors, relating to varying periods.
7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Amount drawn at
quarter end
$A’000
Total facility amount
at quarter end
$A’000
Add notes as necessary for an understanding of
the sources of finance available to the entity.
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have been
entered into or are proposed to be entered into after quarter end, include a note providing details
of those facilities as well.
-
N/a
ASX Listing Rules Appendix 4C (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 4C
Quarterly cash flow report for entities subject to Listing Rule 4.7B
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(2,236)
8.2
Cash and cash equivalents at quarter end (item 4.6)
2,836
8.3
Unused finance facilities available at quarter end (item 7.5)
8.4
Total available funding (item 8.2 + item 8.3)
8.5
Estimated quarters of funding available (item 8.4 divided by
item 8.1)
2,847
1
Note: if the entity has reported positive net operating cash flows in item 1.9, answer item 8.5 as
“N/A”. Otherwise, a figure for the estimated quarters of fu
Share your feedback
Discover