Investor Presentation - December 2025
Released
Released
Announcement PDF
Innovating critical
infrastructure solutions
for a low-carbon future
16 December 2025
www.provaris.energy
ASX.PV1
H2 | CO2
Fiskåbygd, Norway
This presentation and these materials (together the “Presentation”) have been prepared by Provaris
Energy Ltd ACN 109 213 470 (ASX:PV1) (“Provaris”) as a summary of Provaris’ operations and results
for the purposes of a presentation to existing or potential investors in Provaris. By participating in this
Presentation or reviewing or retaining these materials, you acknowledge and represent that you have
read, understood and accepted the terms of this Important Notice and Disclaimer.
This Presentation should be read in conjunction with Provaris’ 29 August 2025 Annual Report lodged
with the Australian Securities Exchange (“ASX”) on 29 August 2025 and other periodic and continuous
disclosure announcements that have been lodged by Provaris with the ASX.
This Presentation may contain forward looking statements concerning projected costs, approval
timelines, construction timelines, earnings, revenue, growth, outlook or other matters (“Projections”).
Any such Projections are based on assumptions which may differ materially from the actual
circumstances which may arise and actual results may vary materially from Projections. You should not
place undue reliance on any Projections, which are based only on current expectations and the
information available to Provaris. The expectations reflected in such Projections are currently considered
by Provaris to be reasonable, but they may be affected by a range of variables that could cause actual
results or trends to differ materially, including but not limited to: price and currency fluctuations, the
ability to obtain reliable hydrogen supply, the ability to locate markets for hydrogen, fluctuations in
renewable energy and hydrogen prices, project site latent conditions, approvals and cost estimates,
development progress, operating results, legislative, fiscal and regulatory developments, and economic
and financial markets conditions, including availability of financing.
Provaris undertakes no obligation to update any Projections for events or circumstances that occur
subsequent to the date of this Presentation or to keep current any of the information provided, except
to the extent required by law.
This Presentation is not a disclosure document, is for information purposes only, should not be used as
the basis for making investment decisions or other decisions in relation to Provaris or its securities, and
does not constitute an offer to issue, or arrange to issue, securities or other financial products. This
Presentation has been prepared without taking into account the investment objectives, financial situation
or particular needs of any particular person. You should consult your own advisors as to legal, tax,
financial and related matters and conduct your own investigations, enquiries and analysis concerning
any transaction or investment or other decision in relation to Provaris.
This Presentation, including opinions set out in it, is based on information compiled or prepared by
Provaris from sources believed to be reliable, although such information has not been verified in all
instances. Provaris has no obligation to tell recipients if it becomes aware of any inaccuracy in or
omission from the information in this Presentation. No representation or warranty, express or implied, is
made as to the fairness, accuracy, completeness or correctness of the information, opinions or
conclusions contained in this Presentation. To the maximum extent permitted by law, none of Provaris,
its directors, employees, advisors or agents, nor any other person, accepts any liability, including without
limitation any liability arising out of fault or negligence, for any loss arising from the use of the
information contained in this Presentation. In particular, no representation or warranty, express or
implied, is given as to the accuracy, completeness, likelihood of achievement or reasonableness of any
forecasts, Projections or prospects referred to in this Presentation.
No distribution in United States or other jurisdictions outside Australia.
This Presentation does not constitute an offer or recommendation to purchase or sell any securities in
any jurisdiction, nor an invitation to apply for such securities in any jurisdiction, and will not form part of
any contract for the acquisition of securities in Provaris. This Presentation does not constitute an offer to
sell, or a solicitation of an offer to buy, securities in the United States. Any securities described in this
Presentation have not been, and will not be, registered under the US Securities Act of 1933, as amended
(“Securities Act”) or the securities laws of any state or other jurisdiction of the United States and may
not be offered or sold in the United States except in transactions exempt from, or not subject to,
registration under the Securities Act and applicable US state securities laws. This Presentation may not
be released to US wire services or distributed in the United States.
The distribution of this Presentation in other jurisdictions outside Australia may also be restricted by law
and any such restrictions should be observed. Any failure to comply with such restrictions may constitute
a violation of applicable securities laws. By accepting this Presentation you represent and warrant that
you are entitled to receive such Presentation in accordance with applicable laws.
Non-IFRS Financial Information
This Presentation may use non-IFRS financial information. Non-IFRS measures have not been subject to
audit or review. Certain of these measures may not be comparable to similarly titled measures of other
companies and should not be construed as an alternative to other financial measures determined in
accordance with Australian accounting standards.
This presentation was authorised by the Board for release on 16 December 2025
$ refers to Australian Dollars unless otherwise indicated.
Important notice and disclaimer
2
3
Investment Highlights
First-Mover Advantage & Strategic Location
Provaris leads the market with proprietary IP for bulk-scale tanks and carriers
validated by advanced engineering.
R&D and Commercialisation focus in Europe.
Market Opportunity
EU hydrogen demand up to ~10Mtpa by 2030, with 70% to be met with imports.
CCS growth expected to reach ~60 Mt CO2 by 2030, requiring significant investment
in storage and shipping solutions.
Capital-Lite Business Model
Commercial model monetizes IP via licensing and fees, while partners handle shipping
capex and ownership reducing financial risk.
Strategic Partnerships & Commercial Progress
Collaborations with industry leaders to accelerate commercialization and expand
Provaris’ market reach effectively.
Technology License Fee & Long-Term Income Streams
Focus on early cash flow through the license of Design and Fabrication IP at FID.
Recurring charter carry fees provide steady income over 10 to 15 years, securing
financial stability.
Hydrogen and CCS infrastructure
critical to achieving EU climate goal of
90% emission reduction by 2040
4
Innovation in large-scale storage and maritime transport solutions critical
to enable cost-effective decarbonization for heavy industries in Europe
> Australian public company (ASX: PV1) with offices located in Sydney and Oslo.
> Pioneering unique IP for the design and robotic fabrication of large pressurized tanks for H2 and CO2, and integrated vessel designs.
> Material technical and commercial milestones in 2026 in collaboration with industrial partners.
> Early cash flow through Technology IP license and ‘Capital-Lite’ model removes burden of large capex.
Compressed H2
carriers
Enabling first-mover,
energy efficient and
cost-effective regional
hydrogen supply chains.
Next generation
CO2 tank
Offers increased volume,
lower steel weights, to solve
existing tank constraints
across multiple markets.
Global
Opportunity
Innovation in bulk-scale
tank and ship design IP
across two markets
Barge storage
Offshore FSIU
Carriers
5
Recent achievements establish a
platform for re-rating technical and
commercial milestones into 2026
> MOU with “K” Line established mid-2025 provides technical,
commercial, capital and global shipping expertise to commercialise
H2Neo carriers in Europe.
> Advanced and maintained development of compressed H2
supply chain, with a focus on Nordic supply and German offtake.
> Commissioned Robotics Centre in Norway to complete H2
Prototype Tank and CO2 test specimens confirming proprietary tank
designs and the use of automation to lower construction costs.
> JV with Yinson for CO2 tanks advanced to FEED, leveraged by
our unique IP in design and fabrication, and creating a large
commercial opportunity.
• Completion of Concept Design & FEED commenced (funded by Yinson)
• Integrated design with Yinson’s FSIU
• Engaged with Asian yards for tank fabrication
• Initiating second market opportunity for CO2 carriers and storage barges
Clear pathway for early 2026 milestone events
Recent 2025 achievements in two key markets
Collaborations with industrial
partners in H2 and CO2 highlight
the relevance of Provaris solutions
> Completion of Prototype Tank delivers final Class Approvals
for H2Neo carriers.
> Norwegian H2 supply projects targeting power capacity
establishes timeline to FEED and FID.
> “K” Line to establish key terms for charter agreements,
financing and ownership structure for operations of H2 carriers.
> CO2 FEED completion (mid-2026) and integration with Yinson
FSIU targeting FID decision in 2026.
> Develop new products and partnerships for CO2 tank
solutions to highlight additional commercial opportunities.
5
Development Milestones for both H2 & CO2 highlight extensive technical
program de-risking commercial events to follow
2026
Today
Oct Nov Dec Q1 Q2 Q3 Q4 Q`1 Q2
2025
Prototype & Class
Approvals
Testing Final Class Approval
“K” Line & Shipyard H2Neo Newbuild
Estimate
//….2030
Newbuild
Order
2027
Tank Fabricator Select preferred
yard
Establish
Production Cell
Establish
Digital Twin
COD
Delivery
Fabrication
Charter Terms
Identification of suitable yards
NOTE: Newbuild order is
dependent on H2 Supply
& Offtake taking FID
H2
2026
Today
Oct Nov Dec Q1 Q2 Q3 Q4 Q`1 Q2
2025
FEED - LCO2 25k Tank Class Approval (GASA)
//….2030
2027
Select preferred
yard
Through to June 2026
Identification of suitable yards – tank fabrication
CO2
Phase 1 Phase 2
Tank Integration with FSIU “Yinson” Target FID
COD
Delivery
LCO2 Carriers
Discussion with Shipowners for use of license of LCO2 tank for new ship designs
Provaris H2Neo License and Income events
• License Fee at FID of Newbuild Order and construction paid over 30-36 mths; and
• Share of Charter Fees at COD over 20yrs.
• The trigger for Newbuild Order will be aligned with the H2 Supply Project and Offtake taking FID
Production Cell
FID
NOTE: All License Fees for CO2 tank design and
fabrication paid to the NewCo JV with Provaris &
Yinson 50/50 owners.
6
7
Norway’s domestic H2 market matures with increasing project FIDs
Funding agency Enova supporting H2 production for coastal maritime offtake; coupled with access to EU funding
23 of 66 projects have reached Final Investment Decision (FID) –
increase of nine in 2024.
Production Growth to ~30ktpa by 2030
~100M fundingfor coastal projects
Funding supports vessels and infrastructure to produce
about 120 MW of green hydrogen, roughly 40 tpd to
reduce maritime CO₂ emissions.
Norwegian Hydrogen fundingsuccess
Norwegian Hydrogen demonstrating success with multiple
rounds of Norway State and EU funding schemes:
Innovation Norway + EU Innovation Fund + EU Hydrogen
Bank (circa 100m).
Germany
Spain
Finland
Norway
8
Norway
• Norway’s grid supply 98% renewable
sources = high electrolyser utilisation
• Industrial PPA €30-50/MWh
• Hydrogen supply ~EUR 4-5/kg *
• RE PPA €50-100/MWh
• Domestic green hydrogen supply
~EUR 9-11/kg *
• Germany’s Import demand 1-3
Mtpa
• ~70% to be met from imports
Source: : Provaris Energy, ASX release 2 Sept. 2024 “Studies reaffirms compressed H2 for low cost
supply”; BloombergNEF
> Europe (and Germany) states up to 70% of hydrogen demand to be met
by imports.
> Strategic supply from Nordic region provides lowest-cost renewable
baseload power, regional proximity, security of supply.
> Collaboration with Baker Hughes for compression equipment at scale
confirms use of mature technologies, costs and efficiency.
> Co-operation with “K” Line to establish commercial shipping terms, fleet
ownership and operations.
> Demand established via MOUs with German utilities for offtake, including
breakthrough Term Sheet signed: Uniper & Norwegian Hydrogen.
> Pipeline of regional development projects continue to Provaris first-mover
position.
Studies confirm ‘Compressed H2’ lowest regional transport cost.
supply
to Europe
Established collaborations with industrial partners
Germany
Deliver 50% more
hydrogen
+20% lower
delivered cost
20% reduction
in capital intensity
10x reduction
in energy loss
Germany
Norway
Rotterdam
FjordH2 Export Project
(Ålesund, Norway)
9
• Responsible for H2 supply
• ~40,000 tonnes per annum
• RFNBO compliant H2 based on EU regulations
• Power supplied from Grid Hydropower
• FEED pending award of 250 MW power reservation
• Offtake Term Sheet and nominate import location
• 10-year term (+5 yr options);
• Fixed price DES; Take-or-pay obligations
• Target first cargos 2030
• Ownership and operator of H2 carriers
• 2* H2Neo carriers for round-trip transport and 1* H2Leo
barge for loading storage
• Long-term charter aligned to Hydrogen SPA tenure (+10yrs)
• Newbuild order triggers License Fees to Provaris
> Power capacity reservation & PPA terms
> Convert Term Sheet to Hydrogen SPA
> Key Terms for Shipping Time-Charter;
> Shipyard Newbuild to confirm capex (and binding charter)
De-risking Milestones in 2026
~40,000 tpa RFNBO-compliant hydrogen supported by Uniper for offtake
to North-West Europe
Source: Norwegian Hydrogen AS
H2
Supply
Hydrogen
Supply
H2
Shipping
H2
Import
+
650 N.miles
10
to focus on early cash flow without large-scale capex
Capital efficient growth model through upfront license fees + equity share in fleet, without owning ships
Illustrative Returns (Per Supply Project - 2 x H2Neo carriers & 1 H2Leo barge):^
License and Origination Fee Income per supply chain project with a binding 15yr Time
Charter. No capital contributions/outlay.
Per Supply Project 1 Income
USD Million
NPV8 at FID
USD Million
Technology License Fees 2 16.5 14.4
Equity share of Time Charter Fees 3 18.0 7.9
Total Fees Per Project 34.5 22.3
~54 (AUD M) ~35 (AUD M)
^ Notes:
1. Supply Project comprises of 2 x H2Neo carrier and 1 x H2Leo barge. All fees allow delivered cost estimates negotiated for delivered cost to be maintained in
Term Sheet discussions.
2. The technology license fee is based on Clarksons Norway AS market knowledge on LNG tank containment license fees and industry charter models. Fee is
based on newbuild price of USD 125 million per H2Neo carrier and USD 80 million for H2Leo barge. Fee payable in milestones over 30 months from signing
Shipbuild Contract. Fees are pre-tax.
3. Based on an illustrative charter model developed with Clarksons Norway AS, which estimates a ‘Bareboat Charter’ rate of ~USD 51,000/day for each H2Neo
carrier and USD 32,000/day for H2Leo barge (excluding O&M, commissions, port fees and fuel consumption) to deliver shipping investors a target levered
equity rate of return of ~15%, over 15 years, 70% gearing. FID 2026. Fees are pre-tax.
Example for each H2 supply project
Technology
License Fee
Origination
Fee
5% as carried equity Ownership Interest in each
H2Neo carrier and H2Leo barge
• Experienced ship owners or SPV to finance and operate the fleet
(ie. “K Line)
• Provaris retains option to co-invest in increase long-term cash flow
5% of Capex for H2Neo carrier & H2Leo barge for
our proprietary ship and tank design
• Based on proven LNG tank containment revenue model.
• Provides early cash flow and revenue payments during
construction of the H2Neo and H2Leo newbuilds.
> Targeting maiden Technology Fees aligned with project FID/Construction decision.
> Long-term recurring Origination Fees based on 10-15yr Time Charter agreements operational from operations.
0.0
1.0
2.0
3.0
4.0
5.0
6.0
Year 1 Year 2 Year 3 Year 4 Year 5 …..... Year 15
US$
Millions
Technology Licence Fee Equity Share (Time Charter)
Technology Fee Paid
Construction (3 years)
Post-FID Cash flows
Share of 15yr Time Charter Fees
11
Technical Partners & Advisors include:
11
Robotic fabrication key to lower construction costs
All design drawings are protected by copyright: ©2023 Provaris Energy Ltd Group
Market leading carrier for gaseous hydrogen provides the lowest
regional transport cost
Approved FEED design, with final Construction Approvals pending Prototype Tank
Illustration of longitude tank.
Cargo capacity: 27,000m3 (450 tonne net); 250 Barg (Closed containment = No boil-off)
Proprietary design for H2Neo Compressed Hydrogen Carrier
H2Leo barge storage for loading and discharge sites
Received AIP from Class (300-600 t H2)
Choice of proven compression technology & loading
arms enables flexible and low capex jetty solutions
> Robotic laser-hybrid welding technology proven to lower costs, increase
productivity and reliability. Extends value of Proprietary IP.
> Fabrication of Prototype Tank underway, following by fatigue testing.
> First Mover Advantage: Four years of IP development, including
advanced FEED Design Approval by Class; risk and safety studies;
prototype final stage. US Patent granted.
> Standard Hull based on MR Tanker: Hybrid electric propulsion system
including LNG, Battery & H2 Fuel Cell
> Partnership with global shipping operator “K” LINE to provide
ownership, financing, newbuild, and operations on long-term charter terms.
Co-operation with global shipping company
“K” Line to accelerate commercialisation of
hydrogen carriers
Shipping expertise to aid commercialisation of Provaris’ hydrogen transport
model through ownership, construction and operations
> Global operator since 1919; +5,000 employees; USD 7 Billion revenue
> Operating fleet 448 vessels; including 90 in the energy sector.
> Established ship management and fleet operations in Europe &
Norway
• 20yrs operating gas carriers - Snøhvit LNG (Equinor).
• Operator of world-first specialised LCO2 carriers for Norway’s Northern
Lights CCS Project.
Strategic Partnerships with Yinson
> Equity partners in FPSOs
> Strategic Partnership with Yinson Production & Harbour Energy for LCO2
carrier transport and storage and injection, Havstjerne CCS (Norway).
Potential to access to Japan’s Innovation Funding
Fleet focused on Decarbonization
12
13
Advancing the development of H2
shipping charter terms and ownership
model
Provides validation of Provaris’ technical and commercial model for
regional shipping of H2
• Memorandum of Understanding (MOU) established in July 2025 to
deliver technical, commercial, and operational support, leveraging extensive
knowledge and global shipping experience.
• Progress on Technical and Commercial workstreams includes:
Technical review of the H2Neo FEED Design and Class Approvals with
owner feedback on the final newbuild specifications.
Site inspection of Prototype Tank fabrication and robotic cell in Norway.
Development of a commercial freight cost model and defining key
terms for a standard charter agreement (opex, crew, dry-dock,
insurance, financing).
• Site visit to Asian yards and fabrication facilities (scheduled for January
2026).
• Development of a Special Purpose Company (SPC) structure for fleet
ownership, financing, and newbuild program.
“K” Line site visit to Robotics Innovation Centre, Fiska (Nov 2025)
Investment in Robotics Centre (Norway) to demonstrate low-cost
fabrication, industrial scale production and extend Provaris IP
Use of proven laser-hybrid welding procedures and materials approved for use by DNV for marine applications
Supported by:
Increased productivity (~20x vs manual TIG) Reduced heat & energy costs
100% quality assurance (NDT) Reduction in CO2 footprint
Reduces material costs, using thinner plate Extends IP to new applications (CO2)
14
Robotic Innovation Centre, Fiska, Norway
14
All design drawings are protected by copyright: ©2023 Provaris Energy Ltd Group
Construction of the H2 Prototype Tank, followed by fatigue and pressure
testing to achieve final Class Approvals
Prototype Tank Specifications:
2.5m * 11m
650 kg H2 capacity at 250 bar
Constructed as 4 sections and then joined for final assembly
8 layers of 10mm Carbon Steel;
Internal liner of 3mm Stainless Steel.
Installed Production Cell and tank sections
15
Prototype tank resumption in 2025 provides a demonstration
facility also strategic for the advancement of CO2 tank IP
Material handling
robot
Cassettes with
fabricated steel
panels
Rotating
cylindrical jig to
hold plates
Laser-welding robot
for both cylinder and
end-cap
End-cap jig with
plates
https://youtu.be/F3_-dLIWIWc
Recent site visit by key partners (November 2025)
Site visit (November 2055): Robotic Cell, Prototype Tank and fabrication demonstrating high
efficiency of automation for using robotics plate handing and welding with nanometer accuracy.
16
16
All design drawings are protected by copyright: ©2023 Provaris Energy Ltd Group
Robotic Cell: Cylinder and End-Cap Jigs with hydrolics to rotate tank Robotic Cell: Plate handling, mounting, tack welding and seem welds
Site Visit : Yinson, “K” Line, Harbour Energy
18 Nov 2025
CO2 Storage
and Maritime
Transport
|
Partnership with Yinson
Solutions for offshore storage and injection, shipping, and land-based storage solutions
> Yinson Production AS - Global energy infrastructure leader
(FPSOs, CCS, Renewables); Operating 9 FSPOs; USD 2.5B revenue.
> JDA (Aug 25) converting to a 50/50 JV Co. to develop large
low pressure LCO2 tank solutions for floating, onshore, and ship-
based storage applications.
• Large tanks increase hull utilitisation; lower vessel capex; and target lower
freight cost
• Existing LCO2 tank capacity restrained to at 5,000 to 7,500 cbm; limitation
due to material thickness and conventional welding.
> Full-funding for FEED: design and approvals for 25,000 cbm low
LCO2 pressure tank for integration with Yinson’s Floating Storage
Injection Unit (FSIU).
> Global opportunity to develop tank designs for offshore, shipping
and storage based on different pressure/specifications (Medium
Pressure, Elevated Pressure).
> Tank designs to be licensed under terms with the JV, ordered by the
vessel owner and constructed by third-party Yards/Fabricators.
18
Leveraging Provaris IP to fast-track LCO2 designs Yinson commit to full-scale development of CCS in Norway
Provaris is Advised by Clarksons Norway AS, Energy Infrastructure Group
> 2025 acquisition of Stella Maris CCS: development of 10 Mtpa
Havstjerne CCS Reservoir (Norway’s continental shelf).
• JV partner is Harbour Energy PLC; €200M EU Innovation grant funding
> Immediate market opportunity to commercialise tanks
through Floating Storage Injection Unit (FSIU) design using new
tanks.
> Partnership with “K” Line for offshore injection and carrier
solutions.
Source: Yinson Production AS.
Illustration: Yinson FSIU (100k cbm) designed for 4 Provaris LCO2 tanks
19
Stella Maris CCS Value Chain
Key Development Milestones
Completion of FEED
Studies
Term Sheet
with Emitters
Project Execution
Window
2024-26 2026-30
Expected Final
Investment Decision
Expected Commercial
Operation Date
Havstjerne by Numbers
200Mt CO2
40%
2026 2030
10MtpaCO2 20MtpaCO2
Gross storage capacity
Expected FID
Peak gross injection rate
First injection
LOI/MoUs from emitters
Stella Maris CCS’s interest in
Havstjerne License
Value Chain
Capture Sites
Transport CO2 from
emitter to CO2
Terminal
Typically, the scope of the emitters but can be
addressed by Stella Maris CCS if needed
Processing
Terminals
Offshore
Transportation
Injection
Facilities
Permanent
Storage
Reservoir
Current Stella Maris CCS Scope
Stella Maris CCS Overview
Yinson Production acquired 100% of Stella Maris CCS AS,
a Norway-based carbon capture and storage company.
Stella Maris will develop a full CCS value chain and holds a 40%
stake in the Havstjerne CO2 Injection & Storage Reservoir.
The project will receive up to EUR 225 million from the EU’s
Innovation Fund.
This enhances our low carbon market presence and
supports our global energy transition goals.
Concept Design completed March 2025 demonstrated
reduction in the number tanks and hull dimensions to save on
capex/opex.
> FEED underway, delivery mid-2026 includes:
• Phase 1 Delivery January 2026; Phase 2 June 2026
• Global finite element modelling
• Static and Fatigue Structural design
• Development of test specimens to be fabricated at Provaris’ robotic cell
facility in Norway and subsequently tested.
• Design of Fabrication facility and integration with Asian yard(s) for
contrsuction costs.
> Engagement with Class for GASA approval mid-2026
(General Approval for Ship Application), from a classification society, DNV,
for a novel ship design or technology.
20
All design drawings are protected by copyright: ©2023 Provaris Energy Ltd Group
FEED underway for LCO2 Tank and integration with Yinson FSIU
Yinson funding provided through JDA terms, targeting ‘FID ready’ mid-2026
Illustration: Yinson FSIU (100k cbm) designed with 4 25,000cbm LP LCO2 tanks
Illustration: 25,000 cbm LP LCO2
Illustration: Tank Fabrication hall
CO2 sector tailwinds… benefiting from traditional shipowners ready
to participate in a new growth market; Europe the early-mover
• Capture and storage capacity quadrupling by 2030 (DNV, Sept 2025) with Europe to surpass Nth America
• Growth to focus on heavy industry… with capture capacity resulting in strong demand for CO2 carrier newbuilds
62
+92
+58
+58
270
2024 2030
North
America
Europe
Rest of
the
world
+ Project pipeline never been stronger
+ Government targets
+ Corporate commitments
+/- Policy uncertainty
Units: MtCO2/yr
22
> Asian yards have designed medium-size LCO2 carriers based on
‘traditional Type C tanks with 6-7,000 cbm storage’.
> Preliminary GA developed for 50,000 cbm LCO2 Low Pressure
Carrier (10 bar) to operate in offshore injection (Europe & Asia)
– demonstrated cargo capacity benefits without changes to the
hull outline.
> Engagement with Asian and European shipowners on
developing alternative designs for CO2 using Provaris tank
designs.
> Including, concepts for 20,000 CBM LCO2 Medium Pressure (19
bar) suitable for short-haul intra-Europe and Asia
All design drawings are protected by copyright: ©2023 Provaris Energy Ltd Group
Additional market opportunities
for CO2 carriers using Provaris tank
Item Provaris
CO2LOS
JIP
Asian
Yards
Cargo Vol [m3] 50,000 43,000 40,000
No. Cargo Tanks 2 6 7
LOA [m] 221 220 220
LPP [m] 220 214 214
Beam [m] 36.5 37.8 36.5
Depth [m] 19.5 20.5 19.5
Design Draft [m] 11.5 11.5 11.75
Lightweight [mt] 22,000 21,800 21,900 (est.)
Cargo Hold Utilization [%] 77 47 < 50 (est.)
Similar Principal Particulars to Asian yard designs for
40,000 m3 carrier results in +25% in Cargo
Capacity
Illustration: General Arrangement for a 50,000c bm LP LCO2 carrier with Provaris tanks
Illustration: 25% gain in cargo capacity based on Provaris GA for 50k LP LCO2
Oslo, Norway (Provaris Norway AS)
Sydney, Australia
Ordinary Shares on Issue (PV1.ASX) 868 M
Market Capitalisation (at 1.6c) A$ 14 M
Unlisted Options 2
Performance Rights 3
63.5 M
26 M
Macquarie Bank – Available Standby Bond Facility 2 A$2,500,000
Convertible Bonds On Issue 2 A$200,000
Shareholding (Undiluted)
1. A$3 million Two-year standby facility with Macquarie Bank, announced 3 May 2024.
2. Unlisted Options: 23.7M at 7.5c, Expiry March 2026; 8.3M at 7.5c Expiry Jul 2026; 4M at 6.6c, Expiry May 2027;
27.6M at 3c, Expiry Feb 2027.
3. Performance Rights held by the Board and Management with conversion on company milestones
Capital Structure
23
Corporate Overview – Provaris Energy (ASX.PV1)
Offices in Sydney and Oslo
9%
1%
8%
26%
56%
Board & Management
Yinson Production AS
Institutions
HNW/Family Office
Retail
Top 20 Holders 38%
Top 50 Holders 47%
24
Martin Carolan
Managing Director
& CEO
Commercial & Capital Markets
A U S T R A L I A / N O R W A Y
Garry Triglavcanin
Product Development Director
Engineer, LNG, Project Development
A U S T R A L I A
Greg Martin
Chairman
Energy,, Infrastructure, Governance
A U S T R A L I A
Andrew Pickering
Non-executive
Director
Shipping, Newbuilds, Tankers, LNG
A U S T R A L I A
David Palmer
Non-executive
Director
Shipping, Commercial, Financing
E N G L A N D
N O R W A Y
Per Roed
Chief Technical Officer
Newbuilds, Tankers, LNG, Ports,
Operations
Mats Fagerberg
Business Development
Commercial, LNG, Shipbroking
P O R T U G A L
Experienced Board & Management aligned with investors
Australian public company (ASX.PV1) with offices in Sydney & Oslo. Global experience across energy and gas infrastructure,
utilities, ship newbuilds, operations, and capital markets (Ownership: 68 million shares)
Norman Marshall
Group Commercial Manager
Legal, Commercial, Finance
A U S T R A L I A
John Stevenson
Group Financial Controller
Accounting, Finance
A U S T R A L I A
Jessica Roed
Operations Manager,
Norway
Shipping, Logistics
N O R W A Y
Supported by world-class technical partners, advisors and industry organisations:
www.provaris.energy
ASX.PV1
@ProvarisEnergy
Provaris Energy Ltd.
Sydney & Oslo
info@provaris.energy
Martin Carolan
Managing Director & CEO
mcarolan@provaris.energy
Norm Marshall
Company Secretary
nmarshall@provaris.energy
Contacts
Share your feedback
Discover